Reservoir of four IOGG deposits. A prefeasibility study was completed in 2011 and the operation’s investment and operation parameters are re-estimated. An exploitation of sulphide resources is applied to recover more than 100 ktpy of fine copper and 470 kg of gold in copper concentrate, plus the coproduction of 4 Mtpy of iron resources (magnetite and hematite) in iron concentrates through the magnetic concentration of the floatation’s tailings. The copper concentrate will be filtered and transported from the Mine-Plant area on trucks to the Harbor Area for its storage and subsequent shipment. On the other hand, the magnetite concentrate will be transported through a concentrate to the Harbor area, where it will be washed, filtered and stored until its shipment. The project’s implementation is scheduled for three years after its construction began.
Industria Proyecto: Mining
El Peñón Mine
Cont. Op. Minera Candelaria
The “Candelaria Operational Continuity Project” considers, among others, the expansion of the current pit, the opening of a smaller pit called “La Española”, the expansion of subway operations to exploit new reserves and the increase in the volume of tailings deposits, which are necessary for the continuity of operations.
Likewise, it contemplates the relocation of power transmission lines and some sections of route C-397; the creation of a reception area for the ore from pirquineros; enabling a third party concentrate storage building at the Punta Padrones port in Caldera; and the optimization of the desalination plant.
Translated with www.DeepL.com/Translator (free version)