Acceso New Calle 13 - Lot 4
Colombia
- Country: Colombia
- Industry: Toll roads and highways
- Location: Bogotá D.C.
- Property: Instituto de Desarrollo Urbano (IDU)
- Volume: 382,165 m2
- Investment: 173 million
- Call Date: 2024
- Term: 3 years
- Bidding: Public
- Status: No suitable offer
Description:
Design and construction of the 13th Street corridor in the city of Bogotá, including the extension, rehabilitation, improvement and construction of pavements, pedestrian bridges and bicycle lanes. It starts at Carrera 100 and extends to the border with the District. Includes: (i) a flyover at 17th Street and 119th Street, (ii) an overpass at Avenida TAM, (iii) four stations, and (iv) operational return to the STPM.