CFE: Transmission Line 1805 Huasteca - Monterrey
Mexico
- Country: Mexico
- Industry: Energy - Electricity
- Location: Nuevo León
- Property: Comisión Federal de Electricidad
- Volume: 441.8 km-c (circuit kilometers) in 3 transmission lines with voltage of 400 kV.
- Call Date: 20-02-2020
- Term: TBC
- Bidding: Public
- Status: Proposal Development
Description:
Construction, equipment, and installation of:
- 441.8 km-c (circuit kilometers) in 3 transmission lines with voltage of 400 kV.
- 2 substations with voltages of 400 kV, with 195.3 MVAr.
- 3 feeders.