Projects | September 6, 2020

CFE: Transmission Line 1805 Huasteca - Monterrey

Mexico

  • Country: Mexico
  • Industry: Energy - Electricity
  • Location: Nuevo León
  • Property: Comisión Federal de Electricidad
  • Volume: 441.8 km-c (circuit kilometers) in 3 transmission lines with voltage of 400 kV.
  • Call Date: 20-02-2020
  • Term: TBC
  • Bidding: Public
  • Status: Proposal Development

Description:

Construction, equipment, and installation of:
  • 441.8 km-c (circuit kilometers) in 3 transmission lines with voltage of 400 kV.
  • 2 substations with voltages of 400 kV, with 195.3 MVAr.
  • 3 feeders.