Co-financed Public initiative. The project consists of designing, financing, constructing, rehabilitating, expanding, operating and maintaining the collection, treatment and final disposal systems for municipal wastewater in the city of Puerto Maldonado, including the construction of a WWTP with an average daily flow (Qpd) of 400 L/s, as well as monitoring and control of the Maximum Allowable Values. Estimated award date: 1Q 2024.
http://www.investinperu.com.pe/en/app/DatosProyecto?idAPProyecto=115
The project consists in the construction of a reservoir located on the Diguillín River, with the capacity to flood 424 hectares. The new work consists of a frontal reservoir with a wall of rocky and/or permeable gravel with a concrete screen on its upstream slope (CFRD). With a wall height of 85 meters and a crown length of 430 meters, it is estimated that the reservoir will cover an irrigated area of 10,000 hectares, benefiting approximately one thousand properties.
The project consists in the construction, maintenance and operation of the Catemu Reservoir, which is located 14 km north of the town of the same name, in the Valparaiso Region. The construction seeks to supply mainly the irrigation needs with a total volume of 180 million m3 of capacity, flooding a total area of approximately 500 hectares. For this purpose, a CFRD (Concrete Face Rockfill Dam) type main wall is planned, which in simple terms is defined as a wall of rock and/or permeable gravel, compacted with a concrete screen on the upstream face, 1,200 m long and 65 m high approximately. In addition, a 25 km feeder channel is included that will allow water to be conveyed from the Aconcagua river basin to the reservoir, thus increasing the water resources that can be stored with 85% irrigation safety. The project is based on an integral view of the basin, which will benefit farmers and users, guaranteeing human consumption and irrigation, in a sustainable manner and over time. It is estimated that the project will benefit 26,577 hectares.